Client:

Mission: 
Mission de base + DIAG + CSSI + OPC + EXE partielle
Costs: 
1 540 000 € Excl. Taxes
Area: 
1064m2
Date: 
2017
Team: 
Clé Millet (architecte et theatre consultant) / Cetrac (M+E engineer) / ECB (Structural Engineer) / Altia (Acoustic Consultant) / Sol Exploreur (Géotechnical Engeneer)

 

The Theater and the former Cinema Surcouf are today intended to function separately. Thus, a large part of this project is to completely review its distribution within the building.
A new contiuguity is created to give the Theater its independence and to allow the Charcot, Bouvet and Surcouf rooms to function as one and the same entity that can accommodate
simultaneously several events.

All the restructuring is internal to the building. Thus, the architectural heritage is restored and even upgraded to regain its original charm and the nobility of its facade decorations.